City of Girard Request for Qualifications (RFQ)

October 6, 2026

City of Girard

Request for Qualifications (RFQ)

The City of Girard is seeking qualified consulting firms for pre-construction engineering and project management in the category equivalent to the Kansas Department of Transportation’s (KDOT) Work Category: Work Category: 441 – Pedestrian and Bicycle Facility Design and Work Category: 241 – Construction Inspection and Testing for the project listed below.

Interested consulting firms must be pre-qualified by KDOT in category 411-Pedestrian and Bicycle Facility Design, and familiar with the project area.

Description

KDOT Transportation Alternatives project 019 TE-0601-01[1], which is a sidewalk project in Girard, Kansas.

Schedule and Deadlines

Technical proposals are due on or before October 20, 2026, to be delivered to 120 N Ozark in Girard, Kansas or by email to johanna.o@girardkansas.gov.  Interested consulting firms must be pre-qualified by KDOT in the work categories noted above.

Anticipated Schedule for Subsequent Events:

Evaluation and ranking of technical proposals shall take place on or about November, 3, 2026 after which all firms that submitted letters of interest will be notified of the ranking. Negotiations with the highest ranked firm to commence on or about November 4, 2026.  Notice to Proceed to be issued November 24, 2026, KDOT Three-Party agreement in place and in effect January 5th, 2027.

Request for Proposal (Technical)

The City of Girard is seeking a consultant to provide design services for Phase III: Pedestrian Transportation Facilities. The work includes construction of approximately 1,250 linear feet of ADA compliant, 10-foot wide, shared-use sidewalk..

Evaluation Factors

Technical proposals will be evaluated based on the factors listed below to rank the most qualified firm in order of preference as first, second, third, etc.  If determined necessary by the City of Girard, a Preliminary Review Committee will be formed to reduce the number of firms evaluated to no fewer than three (3) and no more than five (5).  Reasons for exclusion from evaluation will be: size and/or qualifications; experience of personnel available for project; current uncompleted work or distribution of work; performance; no response from firm; or other reason.  Firms excluded from short list will be notified as to reason for exclusion.

Factors for evaluation and weight:[2]  The highest ranked firm will be asked to enter into negotiations with the City of Girard for an agreement.  In the event the City of Girard cannot reach agreement with the ranked firm, it will terminate negotiations with the said firm and commence negotiations with the next highest ranked firm, and so on, until an agreement is reached for a satisfactory scope of services for a fair and reasonable number of hours, or the City of Girard decides to pursue other alternatives.

Contract Terms and Conditions

This is a KDOT project using KDOT funding.  A standard three (3) phase, three (3) party agreement will be utilized with special attachments for the Kansas “Tax Clearance Certificate”, the “Certification of Final Indirect Costs”, and the “Policy Regarding Sexual Harassment”. 

Instructions for Technical Proposal

Note: No costs shall be contained in the technical proposal.

The main text of consultant’s technical proposal must not exceed 6 pages (including cover sheets, indexes, etc.) to address the topics listed.  Describe processes and procedures proposed by consultant to meet the project completion deadline listed above.  Describe processes and procedures, included best practices, that will be used to perform the tasks and produce the deliverables described above under “Request for Proposal (Technical)”.  Include in the technical proposal items such as:

  • Project manager/engineer in charge
  • History of project with similar tasks
  • Availability of staff to meet schedule without overtime
  • Cost-effective or cost-reduction practices, processes or procedures used by consultant, if any;

Any sub-consultant and their role (if any) that will be performing services on the project. All sub-consultants must complete Special Attachment No. 9 (“Certificate of Final Indirect Costs”), and the Special Attachment No. 10 (“Tax Clearance Certificate”).

Questions about this request for qualifications shall be sent to the City of Girard at 620.724.8918 (ask for Johanna) or via email to johanna.o@girardkansas.gov.


[1]Standard KDOT Project numbering format. CCC: County Number; JJ: Project Jurisdiction (may be one or two characters); NNNN: Project Number; SS: Project Stage.

[2]Note: Itemize evaluation factors with the factor weight the LPA will be using to evaluate the submitted proposals: e.g. “1. Ability to perform the desired services within the time prescribed – 30 pts; 2. Past performance of firm – 15 pts; 3. Training of staff – 10 pts; 4. Previous experience with similar work and knowledge of project procedures – 10 pts; 5. Commitment of resources that could limit performance (ex.: staff, equipment) – 15 pts; 6. Firm’s familiarity with project area – 10 pts; 7. Accessibility of firm’s office – 10 pts (max.)”.